← Company index

Company dossier · Reviewed 2026-11-04

Moore Threads 摩尔线程

GPU hardware and the MUSA programming ecosystem.

ScalingWatch priority 2AI acceleratorsAI software stack

What the evidence says

Moore Threads now has company-reported commercial evidence from a delivered RMB 660 million KUAE cluster contract and a named 2,000-card Wuxi deployment reported near full load, while JD Cloud's 100,000-GPU cluster remains an announced plan rather than an operating deployment. The disclosed utilization and scaling figures are self-reported and do not provide workload-level utilization, reliability, power or a matched current foreign-hardware comparison.

Moore Threads · 2026 half-year report (source)Moore Threads · JD Cloud and Moore Threads announce planned 100,000-GPU cluster (source)Moore Threads / CNINFO · 2026 third-quarter report (unaudited) (source)The Beijing News · Phase-one 2,000-card Wuxi deployment reaches near-full load (source)Moore Threads · Moore Threads full-stack computing supports full-load operation of Wuxi Huishan phase one (source)Moore Threads · GPU and MUSA portfolio (source)

Critical facts

Wuxi operating deploymentreported

The operator reported all 2,000 MTT S5000 cards in phase one of the Wuxi Huishan center were operating and aggregate demand was near full load, with more than 20 customers testing or using the cluster. Workload-level utilization, reliability, power and performance were undisclosed.

As of 2026-08-25The Beijing News · Phase-one 2,000-card Wuxi deployment reaches near-full load (source)Moore Threads · Moore Threads full-stack computing supports full-load operation of Wuxi Huishan phase one (source)
Vendor-reported KUAE training metricsvendor

Company reports Dense-model MFU up to 60%, MoE-model MFU up to 40%, 95% linear scaling efficiency and effective training time above 90%; workload, power and matched comparator details were not disclosed in the filing.

As of 2026-06-30Moore Threads · 2026 half-year report (source)
Third-quarter commercialization and cash usevendor

Unaudited Q3 revenue was RMB 1.552 billion and attributable profit RMB 49.26 million. Nine-month revenue was RMB 3.289 billion; profit excluding nonrecurring items remained negative at RMB 130.75 million and operating cash outflow reached RMB 3.309 billion.

As of 2026-09-30Moore Threads / CNINFO · 2026 third-quarter report (unaudited) (source)

Company news

Timeline →
vendor

Moore Threads reports quarterly profit alongside substantial cash outflow

Q3 profit excluding nonrecurring items reached RMB 20.07 million, while the nine-month figure remained a loss. The company attributes cash consumption to production expansion and strategic stocking.

Why it matters. Revenue growth and quarterly profitability strengthen commercial evidence but do not establish sustained cash generation, accepted unit volumes, performance parity or domestic component provenance.

Moore Threads / CNINFO · 2026 third-quarter report (unaudited) (source)
vendor

JD Cloud announces planned 100,000-GPU cluster based on Moore Threads

JD Cloud and Moore Threads announced an intended 100,000-card full-function GPU cluster for model training, inference and embodied-AI workloads.

Why it matters. The target would be a major domestic scale milestone if built, but the announcement is a plan, not delivery or acceptance evidence. It gives no schedule, GPU model, completed card count, topology, interconnect, power, failure-recovery data or workload result.

Moore Threads · JD Cloud and Moore Threads announce planned 100,000-GPU cluster (source)
reported

Wuxi Huishan center reports 2,000 Moore Threads cards operating near full load

The Wuxi Huishan center's operator reported that all 2,000 MTT S5000 cards in phase one were in operation, aggregate demand was near full load and more than 20 customers were testing or using the cluster. Moore Threads republished the milestone on October 16.

Why it matters. This is named operating-deployment and customer-adoption evidence, stronger than an announced cluster plan. Aggregate demand does not disclose workload-level utilization, accepted service levels, reliability, power, production economics or matched foreign-hardware performance, and the claimed full-stack domestic status lacks public component-level provenance.

The Beijing News · Phase-one 2,000-card Wuxi deployment reaches near-full load (source)Moore Threads · Moore Threads full-stack computing supports full-load operation of Wuxi Huishan phase one (source)
vendor

Moore Threads reports first-half revenue scale and a delivered KUAE cluster contract

Moore Threads' half-year report says revenue reached RMB 1.736 billion, up 147.42% year over year, while attributable net loss narrowed to RMB 11.56 million. It says a RMB 660 million KUAE cluster sales contract was fully delivered and recognized as revenue.

Why it matters. The delivered contract is stronger commercialization evidence than a roadmap announcement. It remains company-reported and does not disclose the customer, accepted card count, topology, workload results, power, uptime or production economics.

Moore Threads · 2026 half-year report (source)